Monday, February 21, 2005

Monday 21st February - footings done

After 2 days of additional digging, shuttering the sides of the footings and pouring concrete we're finally

done. The building inspector made us not only dig to a metre each side of the well, but step it up to about

2.5 metres deep for a further metre each way.






We've also decided to use Celcon blocks to build the walls. It's a thin joint system which doesn't use mortar, but an adhesive insted. Yay ! We're building out of lego !

The builders should be starting on the drain digging today.